Zhou Kaiming, Wang Yan, Deng Janghong. Development and test of measurement system for cable system generated electromagnetic pulse effects[J]. High Power Laser and Particle Beams, 2014, 26: 073207. doi: 10.11884/HPLPB201426.073207
Citation:
Zhou Kaiming, Wang Yan, Deng Janghong. Development and test of measurement system for cable system generated electromagnetic pulse effects[J]. High Power Laser and Particle Beams, 2014, 26: 073207. doi: 10.11884/HPLPB201426.073207
Zhou Kaiming, Wang Yan, Deng Janghong. Development and test of measurement system for cable system generated electromagnetic pulse effects[J]. High Power Laser and Particle Beams, 2014, 26: 073207. doi: 10.11884/HPLPB201426.073207
Citation:
Zhou Kaiming, Wang Yan, Deng Janghong. Development and test of measurement system for cable system generated electromagnetic pulse effects[J]. High Power Laser and Particle Beams, 2014, 26: 073207. doi: 10.11884/HPLPB201426.073207
Analysis of technical problem is presented on the laboratory experimental simulation techniques on the system generated electromagnetic pulse (SGEMP) effects of transient X-ray. And a new method for effective measurement of the SGEMP effects and the experimental simulation method of SGEMP effects to transient -ray are proposed. By certain designs, such as electrons shield, electromagnetism shield, photo-electricity insulation, and signal symmetrical process, X-ray hardness and anti-electromagnetic interference are solved in the measurement system. Under the irradiation of a large scale transient pulse X-ray simulation source, the measurement system can measure fairly good waveforms of SGEMP effects of the cables.