yao weibo, qiu aici, zhang yongmin, et al. Building time and jitter of hundreds of kJ Marx generator[J]. High Power Laser and Particle Beams, 2010, 22.
Citation: yao weibo, qiu aici, zhang yongmin, et al. Building time and jitter of hundreds of kJ Marx generator[J]. High Power Laser and Particle Beams, 2010, 22.

Building time and jitter of hundreds of kJ Marx generator

  • Publish Date: 2010-03-25
  • Based on the hundreds kJ Marx generator, an experimental project is designed to study generator’s building time and jitter. The relations between Marx generator’s building time and jitter, the typical row’s building time and jitter, and the relations of switch operation voltage coefficient are studied. The experimental results are as follows: The generator’s first row’s building time ratios the generator’s building time up to 60%. The first two rows building time ratios generator’s building time up to 73%. Marx generator’s building time jitter is mainly the first row’s jitter. The first row’s building time jitter is mainly from the breakdown delay time jitter of four parallel gas spark switches. Finally, according to the results of experiment, main influencing factors are accordi
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (2027) PDF downloads(318) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return