To improve the accuracy of beam phase measurement system for HIRFL (Heavy Ion Research Facility in Lanzhou), some measures were taken. Matching probe cable electrical length, developing the signal preselector and the system control software, finding and correcting the factors that effect the measurement accuracy. Thus the reliability and accuracy of the system have been improved and it can be used in the practical beam tuning.