chen nian, li yu-hui, li ge, et al. Close-loop control system of the optical klystron magnetic gap of CHG-SRFELJ. High Power Laser and Partical Beams, 2003, 15(09).
Citation: chen nian, li yu-hui, li ge, et al. Close-loop control system of the optical klystron magnetic gap of CHG-SRFELJ. High Power Laser and Partical Beams, 2003, 15(09).

Close-loop control system of the optical klystron magnetic gap of CHG-SRFEL

  • This paper gives a description of the principle of the magnetic gap control system of the optical klystron for the coherent harmonic generation storage-ring free-electron laser in the National Synchrotron Radiation Laboratory. The hardware construction and software flowchart are illustrated for reliably engineering implementation of the system. The three parts of optical klystron, modulator, dispersive section and radiator can be adjusted separately or simultaneously, and the resolution can reach 20μm and the precision 5μm. By means of optimizing the position monitoring instrument of the system, the resolution and the precision can be improved to 1.0μm and 0.2μm respectively. The vacuum chamber of the storage ring between the optical klystron is free of destruction by multi-protection
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return